All Case Studies

Case Studies

Regular failures on a high pressure booster pump

Case Studies

Eliminating steam ingress into the pillow block bearings on a primary air fan, significantly reducing bearing failure.

Case Studies

A coal fired power plant was regular leaking caustic liquid from its Flue Gas Desulphurisation (FGD) pumps causing extensive damage to the pump and surrounding area.

Case Studies

A mining operation in Australia eliminated water leakage to the environment

Case Studies

A chemical manufacturer in the UK was using 2,000 cubic meters of water per year in an API Plan 54 system on a reflux pump, at an annual cost of around £1,700.

Case Study Reference: CH00496

Case Studies

A food and beverage manufacturer in Ireland was seeing failure rates as often as 2 months

Case Studies

Pulp and Paper industry increases plant reliability and reduces maintenance costs.