A US corn milling company was having a persistent problem with the failure of its dodge pillow block bearing.
Case Studies
A global energy company was facing significant losses as a result of damage to the steam turbine housing at one of its ethylene plants.
Case Studies
A US oil seed producer was finding that the single seals used in the production process were inadequate, and were failing on average every three to six months.
Case Studies
An oil seed producer in the US was reporting that in spite of trying a variety of possible solutions, single seals in the production process were only lasting a few months before failing.
Case Studies
AESSEAL stepped in when a mission critical general purpose steam turbine at a UK Ethylene production facility developed leaks and the original OEM seal housing was no longer available.
Case Studies
A wastewater plant in Wales was reporting persistent problems with the failure of the seals on its ditch rotor.
Case Studies
A large oil and gas company in north Africa contacted AESSEAL to look at a sealing issue on its hot oil pumps.