All Case Studies

LabTecta Case Histories Pack

Case Studies

This pack combines many case histories regarding the LabTecta product range. Detailing return on investment and increases in mean time between failure.

Case Studies

Increasing MTBF from 6 months to 6 years and saving over £137,000

Case Studies

Dairy Crest Severnside has more than doubled machine life expectancy and reduced downtime, after replacing standard oil seals with LabTecta bearing protection seals,

Case Studies

International packaging and paper group Mondi has installed AESSEAL water management systems cutting water usage at the plant by more than 60,000 kilolitres per month.

Case Studies

One of the largest Bioethanol production plants in Europe was having a failure every 2 months on a group of pumps in the distillation area of the plant, costing over £75,000 per outage.

Case Studies

A paper mill in Maine, USA was having issues with water and stock getting into their Hydropulper gearbox.

Case Studies

A chemical plant was installing a new conveyor system and the onsite engineer had concerns over the OEM sealing options for the plummer block bearings.