Improved reliability with reduced water cost

curve-down

Gland packing was being used to seal lead ore slurry on Warman pumps at two lead mines. The packing was proving to use a large quantity of water (typically of the order of 60l/min), damage the pump shaft, require frequent adjustment and require replacement as often as every month.


Case Ref:
3079n - 3098n
Mining and Minerals Pump Seals

Solutions for your industry

If you would like to find out more about Mining and Minerals sealing solutions, or to speak to a customer service representative.

For information on our privacy practices and commitment to protecting your privacy, check out our Privacy Policy.